What other equipment is required besides coating robots?
Can existing equipment be used?
A coating booth, drying furnace, clean coating room, and air conditioning system are required.
If the existing equipment is a Takubo type rotary coating system, it can be used.
However, a dedicated circuit must be installed for the middle coat (indium).
2023.01.10
If your question is not covered in the FAQ, please contact us directly via the Inquiries page.